05-02-2026, 03:47 PM
Day 1 - 2"x12" stringer bolted to house with 2 ply 2"x12" frame of deck built with temporary supports
(I forgot to take a picture)
Day 2 - 10 Deck 6"x6"posts being installed. (My son and his friend obscured by a post are building the deck)
The sliding glass door seen behind them being replaced by French Doors and gutters being installed are the next 2 projects.
Day 3 - 2'x10 joists and about 3/4 of the decking completed ( top photo)
Day 4 - Today. Bryan pouring the concrete footing where the base of the ramp going towards the front of the house by the herb garden will go and a second concrete footing where the steps will go down into back yard.
(no photo)
![[Image: rQBfuPu.jpg]](https://i.imgur.com/rQBfuPu.jpg)
(I forgot to take a picture)
Day 2 - 10 Deck 6"x6"posts being installed. (My son and his friend obscured by a post are building the deck)
The sliding glass door seen behind them being replaced by French Doors and gutters being installed are the next 2 projects.
Day 3 - 2'x10 joists and about 3/4 of the decking completed ( top photo)
Day 4 - Today. Bryan pouring the concrete footing where the base of the ramp going towards the front of the house by the herb garden will go and a second concrete footing where the steps will go down into back yard.
(no photo)
![[Image: rQBfuPu.jpg]](https://i.imgur.com/rQBfuPu.jpg)